Logo

Parking Garage Restoration Contractor

Gershman 150 Garage

Our team began Phase 1 of the vital restoration project on the hospital parking garage in St. Charles, MO, focusing on assessing and addressing immediate structural concerns. This phase included shallow depth repairs to tackle surface damage and ensure a smooth driving experience for users. We also conducted full depth repairs to address significant structural issues and maintain the long-term stability of the garage. Key tasks included repairing columns, beams, and soffits to reinforce these critical structural components. We addressed surface scaling to remove deteriorated concrete and restore the garage’s surface integrity. Additionally, post-tension repairs were performed to strengthen the existing concrete and enhance the overall durability of the structure. Winged expansion joints were replaced to accommodate natural building movement and prevent future cracks, while metal support brackets were installed for additional reinforcement. To ensure a clean and safe working environment, dust partitions were utilized throughout this phase. Shoring was provided for temporary support during repairs, guaranteeing the structure's safety and stability.

Restoration Services Performed

Shallow Depth | Full Depth | Column | Beams | Soffit | Surface Scaling | Post Tension Repairs | Winged Expansion Joints | Metal Support Bracket | Dust Partitions | Deck Coating | Shoring | Striping

Looking for a Restoration Contractor?

Keeley Restoration Locations

St. Louis Office

100 Victor St

St. Louis MO 63104

Kansas City Office

1600 E 9th St

Kansas City, MO 64106

Keleey Restoration Phone Numbers

Call us

314-GARAGES (427.2437)

Share by: